Department for Transport
Printable version | E-mail this to a friend |
Revolutionary new Tram Trains to be piloted in South Yorkshire
Passengers in South Yorkshire will be the first in the country to benefit from flexible new Tram Trains that will make their journeys easier and more convenient.
Transport Minister Norman Baker today gave the green light to a
£58m pilot scheme to run revolutionary Tram Trains on both rail
and tram networks, making them ideal for the eight mile non-stop
journeys of no more than 25 minutes between, suburb and city
centres from Sheffield to Rotherham.
As well as providing a boost to the regional economy thanks
to improved connections across the region, the project is also
expected to create 35 new jobs locally as well.
As part of the major works being undertaken to make the
project a reality includes the electrification of a stretch of
track between Sheffield and Rotherham and the construction of 400
metre line linking the tramway to the train tracks.
Norman Baker said:
“Providing better connections between Sheffield and
Rotherham’s city centres and residential areas will help to
reinvigorate the local economy. It will also encourage people to
leave their cars at home, making this pilot environmentally friendly.
“This is great news for passengers in South Yorkshire and
potentially it could benefit people across the country wherever
tram and rail networks exist together.
“Tram Trains have already proven hugely popular on the
Continent. Now we will be able to test whether they can bridge the
gap between tram and train networks in this country.”
Welcoming the announcement, David Brown, SYPTE’s Director
General, said:
"We welcome the announcement today by the Minister
confirming approval of the funding for the Sheffield /Rotherham
tram train project. It is further welcome investment by government
in the transport infrastructure of South Yorkshire. The project
will provide important enhanced local connectivity and demonstrate
the potential, both locally and nationally, of this new technology
to deliver value for money services."
For the pilot to go ahead, rail infrastructure operator
Network Rail will electrify a stretch of track between Sheffield
and Rotherham.
Phil Verster, route managing director for Network Rail, said:
“Tram Trains offer a real opportunity to improve transport
links in urban areas and today’s announcement of funding is
extremely welcome.
“We have already learned a significant amount about how a
Tram Train could benefit Britain’s rail network. Now we can move
into detailed design and delivery of the infrastructure to support
this exciting project which will bring lasting benefits to
passengers in the Sheffield and Rotherham areas.”
Northern Rail’s Managing Director Ian Bevan said:
“We are working with our partners to pilot Tram Trains on the
network as we believe these vehicles can complement heavy rail,
particularly in outer urban and semi-rural areas around major
cities with an existing tram network. There are lessons to be
learned here and Northern cities are among those well placed to
benefit from them.”
Margaret Kay, Managing Director of Stagecoach Supertram,
said:
"We welcome today's announcement and look
forward to playing an important role in this pilot. Tram Trains
offer us the potential to deliver greener, smarter public
transport services to even more people. We have a strong track
record of providing high quality, good value services to the
people of Sheffield day in, day out and we are excited at the
prospect of being able to expand our services even further through
this ground-breaking project."
If the pilot is successful, it opens the way for Tram Trains
to be introduced in other parts of the country.
Councillor Andrew Fender, Chair of the Transport for Greater
Manchester Committee, said:
“We’ll be watching Sheffield’s Tram Train pilot very closely
as we have begun work to understand whether this technology could
be deployed within Greater Manchester. Tram Train could combine
the advantages of the better access to the city centre our
Metrolink tram system provides with the reach of the rail system
into neighbouring districts. It has the potential to both improve
public transport for passengers while also making our local rail
services more cost-effective.”
The new Tram Train vehicles will operate from 2015 on
Sheffield’s Supertram network and on part of the national rail
network, which will be adapted to allow seamless travel from one
to the other.
There are expected to be three services an hour all day and
every day. These will operate from Parkgate Retail Park in
Rotherham travelling through Rotherham Central Station and joining
up to the existing Supertram network at Meadowhall where the
services will then continue onwards to Sheffield City Centre.
Notes to Editors
1. The Tram Train pilot is a partnership between the Department for Transport and Network Rail, Northern Rail Ltd, South Yorkshire Passenger Transport Executive (SYPTE) and Stagecoach Supertram. SYPTE will lead on delivery of the pilot.2. Seven vehicles are being bought for Tram Train and the additional Sheffield Supertram capacity announced in 2011. The total project is estimated to cost £58 million.3. A procurement competition led by Northern in 2009-10 identified Vossloh as the lead bidder for the supply of the Tram Train vehicles. Because Northern’s franchise ends before the two year experimental period, the contract for the vehicles will be let by South Yorkshire PTE and the vehicles are expected to be operated by Stagecoach Supertram.4. Tram Train will commence in 2015 and the pilot will run for two years with a view to permanent operation. Tickets will be fully integrated with Supertram.5. The core objectives of the Tram Train pilot are to: · Understand the changes to industry costs of operating a lighter weight vehicle with track brakes on the national rail network; · Determine changes to technical standards required both to allow inter-running of lightweight tram vehicles with heavy rail passenger and freight traffic and to gain the maximum cost benefit from Tram Train operation; · Gauge passenger perception and acceptability of Tram Train; · Determine the practical and operational issues of extending Tram Trains from the national rail network to on-street running; and · Understand the technical and operational challenges involved in this project so that the concept can potentially be rolled out elsewhere.6. A Tram Train vehicle is based on a tram that has been enhanced to make it suitable for operation on the main line as a train as well as street running. Typically a tram train will have: · Higher vehicle crashworthiness to allow for the higher average speed operations of it and other trains and to resist slow speed collisions with heavier trains; · Enhancements to the signalling system to minimise the risk of a collision between trains and Tram Trains. This involves installing train protection and warning system (TPWS) at all signals, whereas TPWS is currently installed at junctions and sites with high levels of signal passed at danger (SPAD) incidents; · Road Traffic Act compliant head lights and direction indicators for on-street operation and to meet rail main line lighting requirements for visibility; · Additional main line signalling and communications equipment such as TPWS and the Global System for Mobile Communication – Railway (GSM-R); · More seating than a tram for longer distance journeys; · A wheel profile suitable for both tramway and standard main line track. Press Enquiries: 020 7944 3108Out of Hours: 020 7944 4292Public Enquiries: 0300 330 3000Email: DfTPressReleases@dft.gsi.gov.ukDepartment for Transport Website: http://www.dft.gov.ukwww.twitter.com/transportgovuk | www.youtube.com/transportgovuk | www.flickr.com/transportgovuk
Contacts:
DfT Press Office - Rail
Phone: DfT Press Office 020 7944
3108
Mobile: Out of Hours 020 7944 4292
DfTPressReleases@dft.gsi.gov.uk